Distance - Wastewater Collection System Design and Construction Workshop (1.2 CEUs)
ARE YOU:
Looking for professional development but do not have the time to take off from work?
Looking for refresher course on specific engineering topics and cannot find an intensive course to serve your needs?
This may be your ideal Professional Development course!
Find out more on how the Professional Development Distance Program may work for you - Click here
Duration:
This course is approximately 3 weeks in duration.
Learning Method:
The PDDP program is more of a self-guided learning style.
You are required to read the notes and materials given, complete the follow-up assignments on your own, send in your questions prior to your 1 hour webinar meeting (if required) and be involved in live discussion via the internet.
Once you have completed the course, you will receive a certificate of completion
Description
Objective
After Attending This Workshop You Will Be Able To:
- Understand fundamentals of sanitary water sewer system design and application
- Design a new sewer system
- Back an analysis of existing systems for any possible problems
- Learn how to use the commercial package Sewer CAD and flow Master
- Discover the numerous issues to consider when planning sewer water drainage systems at a given site
- Learn to design sanitary sewer water drainage systems to meet given planning objectives
Materials Required
- Standard engineering calculator with scientific functions
- Laptop for software training (if available)
Special Features
Target Audience
The PDDP Distance Education program works as follows:
Once you register for this course, you will be sent a login username and password for our online distance website.
You will receive the course notes in hard copy through the online website, you will receive a set of notes each week covering the course material.
A one hour video-conference session will be conducted by your instructor each week (if required). The objective of this session is to assist in solving the assignments, as well as answer student questions that should be sent to instructor early enough prior to the meeting time. In addition with being able to communicate with the instructor, you will also be able to communicate with other students in the same class and watch their questions being answered as well. (A high speed internet connection is strongly recommended for this feature).
Each set of exercises can be completed and submitted by the indicated date and your completed exercise will be marked online and and returned by your instructor.
To gain the most from your course, it is highly recommended that you participate fully in all discussions and exercises. Please remember that each course has a form of quiz or exercise at the end to test your understanding of the material. You will be informed of these dates when you receive the course schedule.
*Course commencement date is subject to instructor availability.
- Definition of terms and classification of sanitary sewers
- Phases of project development
- Interrelations of project development phases
- Parties involved in design and construction of sanitary sewer projects
- Role of parties in each phase
- Control of sanitary sewer system use
- Safety
- Capacity, management, operations, and maintenance (cmom) sanitary
- Design period
- Population or dwelling unit forecast
- Land use and/or employee forecasts
- Average unit flows
- Average flows
- Infiltration/ inflow
- Peak and minimum flows
- Uncertainty in forecasts
- Municipal Wastewater Collection Systems
- Corrosion processes and controls in municipal wastewater collection systems
- Non biological corrosion processes
- Microbiologically induced corrosion processes
- Corrosion prediction models
- Sulfide corrosion control
- Hydraulic principles
- Flow resistance
- Self-cleansing in sanitary sewers
- Design computations
- Hydraulic continuity through manholes
- Head loss in manholes
- Water surface profiles
- Service lateral slopes
- Partial listing of current sewer analysis/design software
- Energy
- Orifices and Weirs
- Friction Losses
- Pressure Flow
- Open-Channel Flow
- Computer Applications
- Flow master
- Energy concepts of sewer systems
- Combined versus separate sewers
- Layout of system
- Curved sanitary sewers
- Type of conduit
- Ventilation
- Depth of sanitary sewer
- Flow velocities and design depths of flow
- Average wastewater flows from different sources
- Infiltration/ inflow
- Infiltration/ ex filtration and low-pressure air testing
- Design for various conditions
- Relief sewers
- Organization of computations
- Peaking factors
- Minimum and maximum velocities
- Self-cleansing velocities
- Minimum pipe size
- Capacity design
- Infiltration
- Sewer pipes
- Separation of water main and sewers
- Optimum bedding conditions
- Cover
- Ductile iron pipe location
- Crossings
- Manholes
- Rainfall
- Rainfall Abstractions and Runoff Volume
- Peaking factors
- Sewer location and alignment requirements
- Location in new subdivisions.
- Location in existing streets
- Location in unpaved areas
- Easement sewer lines
- Lines in drainage
- Alignment
- Manhole criteria
- Spacing
- Invert elevations
- Special construction requirements
- Drop connection criteria
- Steps in the Design of a Sanitary
- Sewer System
- Step by step Example of Sanitary
- Sewer Design
- Control of Combined Sewer Overflow (CSO)
- Sewer Pipe Types in a Collection
- System
- Sanitary Sewer Primary appurtenances for sanitary sewers:
- Manholes
- Drop inlets to manholes
- Building connections
- Junction chambers
- Flows from Conventional Domestic Devices
- Flow-Reduction Devices and Systems
- General pump station design
- Self-priming pump station
- Submersible pump station
- Pumps and motors
- Valve box
- Wet well design criteria
- Electrical work
- Control panel
- Pump station site
- Pump station spare parts and completion
- Septic tank
- Typical septic tank installation
- Subsurface absorption field approval
- Subsurface absorption trench
- Infiltration chambers
- Absorption trench system
- Lagoons
- Aerobic systems
- Septic system additives
- Waste water system failures
- Typical sanitary sewer design criteria
TLNT reserves the right to cancel or change the date or location of its events. TLNT's responsibility will, under no circumstances, exceed the amount of the fee collected. TLNT is not responsible for the purchase of non-refundable travel arrangements or accommodations or the cancellation/change fees associated with cancelling them. Please call to confirm that the course is running before confirming travel arrangements and accommodations. Please click here for complete policies.
We could offer any of our courses at a location of your choice and customized contents according to your needs, please contact us at: [email protected] or click here to submit an online request.
Reviews
Interested in this course?
Click HereStart time: {{ sessionStartTimeWithZone(session) }}
{{ timeZoneCaptionFromSettings() }}
There are no future dates for this course
Jumpstart your training with the help of Talented Technology Training Canada (TTT-Canada) & the Canada Job Grant.
Seminars and Workshops offered within your organization anywhere in the world.
Get notified of our upcoming early bird discounts.
Submit this form for no-obligation course inquiries. One of our agents will contact you at the email or phone you enter below.