Distance - Commissioning of Combined Cycle Power Plants: Preparation, Planning, Pre-Commissioning Checks and Tests, Commissioning Schedule, Detailed Commissioning Procedures and Instructions for each Equipment in a Combined Cycle Power Plant, Instrum
ARE YOU:
Looking for professional development but do not have the time to take off from work?
Looking for refresher course on specific engineering topics and cannot find an intensive course to serve your needs?
This may be your ideal Professional Development course!
Find out more on how the Professional Development Distance Program may work for you - Click here
Duration:
This course is approximately 6-8 weeks in duration.
Learning Method:
The PDDP program is more of a self-guided learning style.
You are required to read the notes and materials given, complete the follow-up assignments on your own, send in your questions prior to your 1 hour webinar meeting (if required) and be involved in live discussion via the internet.
Once you have completed the course, you will receive a certificate of completion
- Engineers of all disciplines
- Managers
- Technicians
- Maintenance personnel
- Other technical individuals
- Pre-Commissioning Checks and Tests, Detailed Tests and Commissioning Procedures and Instructions for Every Equipment in Combined Cycle Power Plants: Gain a thorough understanding of all pre-commissioning checks and tests, and all commissioning procedures and instructions for every equipment in combined cycle power plants
- Commissioning Management System of Combined Cycle Power Plants: Discover the benefits of the Commissioning Management System of combined cycle power plants including all commissioning procedures and documents, purpose of commissioning, responsibilities, system description, organization, working parties, test teams, documentation, testing and commissioning schedules, test reports, safety, plant certification, and plant completion report
- Commissioning Procedures and Instructions for Heat Recovery Steam Generators, Air Blow and Steam Blow of Steam and Gas Piping in Combined Cycle Power Plants: Learn about the commissioning procedures and instructions for heat recovery steam generators, chemical cleaning of heat recovery steam generators, air blow and gas blow of steam and gas piping in combined cycle power plants, safety valve setting, and soot blowers.
- Commissioning Procedures and Instructions for Gas Turbines and Steam Turbines: Gain a thorough understanding of all the commissioning procedures and instructions for gas and steam turbines and auxiliaries including acid cleaning of oil pipelines, lubrication and governing system (oil flushing and hydraulic testing), jacking oil system, governing system, regenerative system, barring gear, vacuum tightness test, first rolling of turbine and data logging
- Commissioning Procedures and Instructions for Generator and Auxiliaries: Discover all the commissioning procedures and instructions for generator and auxiliaries including generator, seal oil system, hydrogen gas system, stator water system, rolling and start-up of generators
- Commissioning Procedures and Instructions for Electrical Equipment: Learn about all the commissioning procedures and instructions for electrical equipment including switchyard equipment, switchgear, transformers, and motors
- Operational Testing, Performance Testing, Heat Rate Testing, Emission Testing of Combined Cycle Power Plants: Gain a thorough understanding of operational testing, first fire, generator synchronization, performance testing, heat rate testing, emission testing, contract testing, CO2 concentration tests, electrical full-load rejection test, duct burner testing, partial load stability test, and reliability test of combined cycle power plants
- “POWER GENERATION HANDBOOK” second edition published by McGraw-Hill in 2012 (800 pages)
- Excerpt of the relevant chapters from the “POWER PLANT EQUIPMENT OPERATION AND MAINTENANCE GUIDE” published by McGraw-Hill in 2012 (800 pages)
- COMMISSIONING of COMBINED CYCLE POWER PLANTS MANUAL (includes practical information about all pre-commissioning checks and tests, typical commissioning schedule, detailed tests and commissioning procedures and instructions for every component and system in combined cycle power plant - 600 pages)
The PDDP Distance Education program works as follows:
Once you register for this course, you will be sent a login username and password for our online distance website.
You will receive the course notes in hard copy through the online website, you will receive a set of notes each week covering the course material.
A one hour video-conference session will be conducted by your instructor each week (if required). The objective of this session is to assist in solving the assignments, as well as answer student questions that should be sent to instructor early enough prior to the meeting time. In addition with being able to communicate with the instructor, you will also be able to communicate with other students in the same class and watch their questions being answered as well. (A high speed internet connection is strongly recommended for this feature).
Each set of exercises can be completed and submitted by the indicated date and your completed exercise will be marked online and and returned by your instructor.
To gain the most from your course, it is highly recommended that you participate fully in all discussions and exercises. Please remember that each course has a form of quiz or exercise at the end to test your understanding of the material. You will be informed of these dates when you receive the course schedule.
*Course commencement date is subject to instructor availability.
Philip Kiameh
- Power Generation Handbook: Gas Turbines, Steam Power Plants, Co-generation, and Combined Cycles, second edition, (800 pages), McGraw-Hill, New York, October 2011.
- Electrical Equipment Handbook (600 pages), McGraw-Hill, New York, March 2003.
- Power Plant Equipment Operation and Maintenance Guide (800 pages), McGraw-Hill, New York, January 2012.
- Industrial Instrumentation and Modern Control Systems (400 pages), Custom Publishing, University of Toronto, University of Toronto Custom Publishing (1999).
- Industrial Equipment (600 pages), Custom Publishing, University of Toronto, University of Toronto, University of Toronto Custom Publishing (1999).
- The first "Excellence in Teaching" award offered by the Professional Development Center at University of Toronto (May, 1996).
- The "Excellence in Teaching Award" in April 2007 offered by TUV Akademie (TUV Akademie is one of the largest Professional Development centre in world, it is based in Germany and the United Arab Emirates, and provides engineering training to engineers and managers across Europe and the Middle East).
- Awarded graduation “With Distinction” from Dalhousie University when completed Bachelor of Engineering degree (1983).
- Entrance Scholarship to University of Ottawa (1984).
- Natural Science and Engineering Research Counsel (NSERC) scholarship towards graduate studies – Master of Applied Science in Engineering (1984 – 1985).
- Commissioning Procedure and Documents: Purpose of Commissioning, Responsibilities, System Description, Organization, Working Parties, Test Teams, Documentation, Safety, Plant Certification, Plant Completion Report
- System Turnover from Construction to Commissioning, Turnover packages
- Engineering Drawings, Piping and Instrument Diagrams, and Electrical on-line Diagrams
- System Walkdown, Punch list
- Component Testing, Responsibilities, Nameplate Data, Test Specifications, Lubrication
- Flushing the Following Systems: Lubricating oil, Fuel oil, Hydraulic Oil, Cooling Water, Raw Water and Service Water, Fire Protection, Feedwater and Condensate, Chemical Cleaning
- Commissioning of Valves and Pumps
- Lubricating Oil Flushing Procedure
- Heat Exchangers, Chemical Cleaning of the Heat Recovery Steam Generators
- Air Blow and Steam Blow of the Steam and Gas Piping System
- Temperature Cycling
- Commissioning of Motors, Cables, Switchgear, and Motor Control Centers
- Commissioning of Transformers and Switchyards, Electrical Meters and Relays, Instrumentation
- Loop Checks, Instruments, Transmitters
- Commissioning of DC power and UPS system
- Initial Plant Energization
- Commissioning of the Distributed Control System
- Commissioning of the Instrument Air
- Water Treatment, Waste Water Treatment
- Commissioning of Fire Detection and Protection
- Commissioning of the Cooling Water System, Condensers,
- Commissioning of Cooling Towers
- Commissioning of Steam, Feedwater and Condensate Systems
- Commissioning of the Heat Recovery Steam Generator
- Sample Panels
- Fuel Gas, Liquid Fuel
- Air Conditioning and Ventilation
- System Checkout
- Commissioning of Gas Turbines
- Commissioning of Steam Turbine
- Thermal Expansion
- Safety Valve Setting: Constructional Test, Pre-Commissioning Tests, Commissioning, Protocol on Safety Valve Setting
- Commissioning of Soot Blowers: Readings for Operation with Steam (Mechanical), Check Up of Electrical System
- Turbines and Auxiliaries
- Acid Cleaning of Oil Pipelines: Passivation and Drying, Final Erection in Position, Safety
- Lubrication and Governing System: Preparation for Oil Filling in Man oil tank, Charging of Oil Systems, Oil Flushing Circuit of a Typical 200/210 MW Turbine Lube Oil System, Oil Flushing, Hydraulic Testing of Oil System, Additional Checks to be Made on Turbine Oil System
- Jacking Oil System: Oil Flushing, Relief Valve Setting, Preparation for Hydraulic Testing, Hydraulic Testing
- Governing System: Checking of Governing System
- Regenerative System: Preparations, Procedure, Shell Sides and Drain Lines of Heaters, Safety and Precaution, HP/LP Heaters
- Boiler Feed Pump Commissioning: Constructional Tests, Pre-Commissioning, Commissioning Tests
- Barring Gear: Preparation, Trial Run of Motor, Preparation for Putting The Barring Gear in Operation
- Vacuum Tightness Test: Preparation of the System Before Filling with DM Water, Vacuum Tightness Test By Filling Up with DM Water, Raising the Vacuum in Condenser
- Check List for First Rolling of Turbine (200/210 MW), Preparation, Preliminary Operation Before Rolling, Operation to Be Carried out For The Units with HP/IP Bypass System, Data to be Collected During Commissioning and Also After Loading to Full Capacity in 200/210 MW Turbine Generator Set
- Generator General Inspection and Checks
- Generator: Preliminary Checks of Resistance’ Insulation Resistance, Ohmic Resistances, Generator Stator Winding, Generator Rotor Winding
- Generator Testing: Laboratory Tests, Field Tests
- Laboratory Diagnostic Tests of Stator Winding Insulation: Voltage Endurance Test, Thermal Cycling, Dissection of Coils, Insulation Failure Analysis, Partial Discharge Test, Dissipation Factor, Turn-to-Turn, Multi-Factor stress, Forensic Analysis
- Field Tests: Insulation Resistance Test, DC Winding Resistance Test, Visual Inspection Test, Digital Electromagnetic Core Imperfection Detector (EL-CID), Partial Discharge Data Interpretation and Analysis, Corona Probe Test, Dissipation Factor (tan delta test), AC and DC Hi-pot Test, Wedge Tightness Test, Core Repair, if Loose, Insulation Condition Assessment
- Rotor Testing: Recurrent Surge Oscillograph (RSO), Air Purge Test, Insulation Resistance Test, Winding Resistance Test, Impedance Test, Bolt and Air Tightness Test, Die-Penetrant and Ultrasound Test of the Retaining Rings
- Seal Oil System: Equipment Inspection, Control Panels, AC Seal Oil Pump Motor Set, DC Seal Oil Pump Motor Set, Oil Injector, Induction Liquid Indicator, Seal Oil Coolers, Seal Oil Filters, Damper Tank, Differential Pressure Regulator, Pressure Oil Regulator, Exhaust Fan and Motor on The Drain Header, Exhaust Fan and Motor on Main Oil Tank, Commissioning of Seal Oil Starting Panel, Commissioning of Seal Oil Signaling Panel, Check with 200 V DC and AC Supplies, Trial Run of Seal Oil Pump Motors, DC Seal Oil Pump Motor, Trial Run of Exhaust Fans, Oil Flushing, Trial Run of AC Seal Oil Pump, Second Stage Flushing, Third Stage Flushing, Fourth Stage Flushing, Fifth Stage Flushing, Commissioning of The System
- Hydrogen Gas System: Equipment Inspection, Hydrogen Manifold, Carbon Dioxide Manifold, Hydrogen Gas Drier, Hydrogen Control Panel, hydrogen Cooling Water Pumps and Motors, Hydrogen Gas Coolers, Gas System Piping and Valves, Instrument, Gas Tightness Test of Generator with Gas and Seal Oil System, Requirements, Testing of CO2 Manifold Associated Elements and Piping, Testing of Gas Analyzer, Associated Elements and Piping, Final Gas Tightness test, Trial Run of Hydrogen Cooling Water Pump Motors, Trial Run of The Pumps, Charging Hydrogen Coolers, Conclusions
- Stator Water System: Equipment Inspection, Stator Water Cooling Pumps and Motors, Water Coolers, Water Filter, Magnetic Filter, Expansion Tank, Water Jet Ejector, Stator Water System Piping and Valves, Gas Trap, Instruments, Commissioning of Stator Water Starting Panel, Checks with 220 V DC and AC Supplies, Trial Run of Stator Cooling Water Pump Motor, Flushing of Stator Cooling Water System, First Stage Flushing (By pass all equipment except filters), Second Stage Flushing (Cooler B included), Third Stage Flushing (Cooling A included), Fourth Stage Flushing (Magnetic filters included), Trial Run of Stator Water Pumps (5th stage flushing), Commissioning of The System (Final run)
- Rolling and Dryout of Generator: Requirements for rolling, Requirements for Dryout, Rolling (200/210 MW Turbines) BTPS/SSTPP, Checks During Rolling, Dryout Operation, Hydrogen Filling in The Generator
- Electrical Equipment: Switchyard Equipment, 400 kV Air Blast Circuit Breaker, Pantograph Isolator, Horizontal Centre-Break Isolator, Current Transformers, Capacitor Voltage Transformer, Lightning Arrestor, Earthing Switch
- Switchgear: Description, Tests
- Record the Salient Parameters of the Transformer, Pre-Commissioning Checks, General Checks, Winding Temperature Indicator (WTI) and Oil Temperature Indicator (OTI), Buchholtz Relays, General Inspection, Functional Checks
- Transformer Pre-Commissioning Tests: Insulation Resistance Test, Dielectric Absorption and Polarization Index Tests, Two Voltage Test (Step Voltage Test)
- Transformer Commissioning Tests: Magnetic Balance Test, Excitation Current Measurement, Short Circuit Impedance Measurement, Frequency Response Analysis, Winding Resistance Measurement, Recovery Voltage Measurement (RVM), Online Moisture Measurement Through Domino, Capacitance and Tan Measurement, Dissolved Gas Analysis, Furan Analysis in Oil, Measurement of Voltage Ratio and Check of Phase Displacement, Measurement of Short-Circuit Impedance and Load Loss, Measurement of No-Load Loss and Current, Dielectric Tests, Separate Source ac Voltage Test, Induced ac Voltage Test, Partial Discharge Measurement, Tests on On-Load Tap Changer, Open-Circuit and Short-Circuit Tests, temperature-rise test, lightning-impulse tests, switching impulse voltage test, Measurement of Zero Sequence Impedance(s), Determination of Sound Level, Measurement of Harmonics of the No-Load Current, Measurement of Insulation Resistance, Short-Circuit Withstand Test, Condensation Test, Condensation and Humidity Penetration Test, Low Temperature Test, Heat Shock Test at -5C, Heating Shock Test at -25C
- Testing of HV Bushing
- Blocked Cooling System: Thermoscanning of Radiators, Differential Temperature, High Oil Winding Temperature
- Transformer Water Content in Oil and Paper, Dependency Between the Water Content in Mineral Oil and Cellulose Paper
- Relay Tests
- Transformer Commissioning
- Circuit Breakers: SF6 Circuit Breakers, Vacuum Circuit Breakers, Air Blast Circuit Breaker, Oil-Filled Circuit Breaker, Short-Circuit Current
- Commissioning of Switchgear and Circuit Breakers: Start-Up and Commissioning, Protection, Mechanical Checks and Visual Inspection, Electrical Inspection, Insulation Resistance, Contact Resistance, Functional Operation, Auxiliary Equipment
- HT Motor, Tests, Format and Guidance for Commissioning Reports, Safety Rules Clearance Certificate, Record of Initial Operation Certificate, Procedure for The Control & Handling of Defects, Stage I: Requirements for the Issue of Safety Clearance Certificate, Requirement for the Internal Takeover Certificate, Stage IV: Internal Final Contract Certificate Up to Guarantee Period
- Operational Testing, First Fire, Steam Turbine Bypass, Generator Synchronization, Water Use
- Normal Balance of Plant System Operation, Test Data, Steam Traps, Plant Outages, Special Situations, Housekeeping
- Performance Testing, Heat Rate Testing
- Emission Testing, Contract Testing, CO2 Concentration Tests
- Electrical Full-Load Rejection Test
- Duct Burner Testing
- Partial Load Stability Test
- Reliability Test
- System Turnover From Commissioning to the Owner, Turnover Packages, System Walkdowns, Conclusions
TLNT reserves the right to cancel or change the date or location of its events. TLNT's responsibility will, under no circumstances, exceed the amount of the fee collected. TLNT is not responsible for the purchase of non-refundable travel arrangements or accommodations or the cancellation/change fees associated with cancelling them. Please call to confirm that the course is running before confirming travel arrangements and accommodations. Please click here for complete policies.
We could offer any of our courses at a location of your choice and customized contents according to your needs, please contact us at: [email protected] or click here to submit an online request.
Reviews
Interested in this course?
Click HereStart time: {{ sessionStartTimeWithZone(session) }}
{{ timeZoneCaptionFromSettings() }}
There are no future dates for this course
Jumpstart your training with the help of Talented Technology Training Canada (TTT-Canada) & the Canada Job Grant.
Seminars and Workshops offered within your organization anywhere in the world.
Get notified of our upcoming early bird discounts.
Submit this form for no-obligation course inquiries. One of our agents will contact you at the email or phone you enter below.