Distance - Design of Circulating Fluidized Bed Boilers: Design of Circulating Fluidized Bed (CFB) Boiler Components, Furnace Design, CFB Boiler Design with External Fluid Bed Heat Excganger, CFB Boiler Design Without Cyclone, Design of Water Wall, Su
ARE YOU:
Looking for professional development but do not have the time to take off from work?
Looking for refresher course on specific engineering topics and cannot find an intensive course to serve your needs?
This may be your ideal Professional Development course!
Find out more on how the Professional Development Distance Program may work for you - Click here
Duration:
This course is approximately 4-5 weeks in duration.
Learning Method:
The PDDP program is more of a self-guided learning style.
You are required to read the notes and materials given, complete the follow-up assignments on your own, send in your questions prior to your 1 hour webinar meeting (if required) and be involved in live discussion via the internet.
Once you have completed the course, you will receive a certificate of completion
- Engineers of all disciplines
- Managers
- Technicians
- Maintenance personnel
- Other technical individuals
- Circulating Fluidized Bed Boiler Design: Gain a thorough understanding of the best design methods of circulating fluidized bed boilers.
- Design of Circulating Fluidized Bed Boiler Components and Systems: Learn all the techniques used to design CFB boiler equipment and systems including furnace, cyclones, economizers, superheaters, reheaters, loop seals, expansion joints, refractory, and L-valves.
- Design of Circulating Fluidized Bed Boiler to Achieve Highest Efficiency, and Best Performance and Economics: Gain a thorough understanding of all the methods used to design CFB boilers having the highest efficiency, longevity and capacity factor as well as best economics.
- Circulating Fluidized Bed Boiler Equipment: Learn about various equipment of circulating fluidized bed boilers including: furnaces, cyclones, economizers, superheaters, reheaters, ammonia injection systems, electrostatic precipitators, polishing dry scrubbers, fuel and sorbent feeding systems, bottom ash handling and extraction systems and materials.
- Circulating Fluidized Bed Boiler Environmental Emissions: Learn about the monitoring and control of environmental emissions from circulating fluidized boilers.
- Circulating Fluidized Bed Boiler Instrumentation and Control Systems: Learn about the latest instrumentation and control systems of circulating fluidized bed boilers.
- Circulating Fluidized Bed Boiler Reliability and Testing: Increase your knowledge of predictive and preventive maintenance, reliability and testing of circulating fluidized bed boilers.
- Circulating Fluidized Bed Boiler Selection and Applications: Gain a detailed understanding of the selection considerations and applications of circulating fluidized bed boilers.
- Circulating Fluidized Bed Boiler Maintenance: Learn all the maintenance activities required for circulating fluidized bed boilers, to minimize their operating cost and maximize their efficiency, reliability, and longevity.
- Circulating Fluidized Bed Boiler Refurbishment, and Life Extension Methods: Learn about life cycle cost, profitability, refurbishment, and life extension methods for all types of circulating fluidized bed boilers.
- Circulating Fluidized Bed Boiler Commissioning: Understand all the commissioning requirements of circulating fluidized bed boilers.
- Circulating Fluidized Bed Boiler Codes and Standards: Learn all the codes and standards applicable for circulating fluidized bed boilers.
- “POWER GENERATION HANDBOOK” published by McGraw-Hill in 2012 (800 pages)
- Design of Circulating Fluidized Bed Boiler manual (600 pages)
The PDDP Distance Education program works as follows:
Once you register for this course, you will be sent a login username and password for our online distance website.
You will receive the course notes in hard copy through the online website, you will receive a set of notes each week covering the course material.
A one hour video-conference session will be conducted by your instructor each week (if required). The objective of this session is to assist in solving the assignments, as well as answer student questions that should be sent to instructor early enough prior to the meeting time. In addition with being able to communicate with the instructor, you will also be able to communicate with other students in the same class and watch their questions being answered as well. (A high speed internet connection is strongly recommended for this feature).
Each set of exercises can be completed and submitted by the indicated date and your completed exercise will be marked online and and returned by your instructor.
To gain the most from your course, it is highly recommended that you participate fully in all discussions and exercises. Please remember that each course has a form of quiz or exercise at the end to test your understanding of the material. You will be informed of these dates when you receive the course schedule.
*Course commencement date is subject to instructor availability.
Philip Kiameh
- Power Generation Handbook: Gas Turbines, Steam Power Plants, Co-generation, and Combined Cycles, second edition, (800 pages), McGraw-Hill, New York, October 2011.
- Electrical Equipment Handbook (600 pages), McGraw-Hill, New York, March 2003.
- Power Plant Equipment Operation and Maintenance Guide (800 pages), McGraw-Hill, New York, January 2012.
- Industrial Instrumentation and Modern Control Systems (400 pages), Custom Publishing, University of Toronto, University of Toronto Custom Publishing (1999).
- Industrial Equipment (600 pages), Custom Publishing, University of Toronto, University of Toronto, University of Toronto Custom Publishing (1999).
- The first "Excellence in Teaching" award offered by the Professional Development Center at University of Toronto (May, 1996).
- The "Excellence in Teaching Award" in April 2007 offered by TUV Akademie (TUV Akademie is one of the largest Professional Development centre in world, it is based in Germany and the United Arab Emirates, and provides engineering training to engineers and managers across Europe and the Middle East).
- Awarded graduation “With Distinction” from Dalhousie University when completed Bachelor of Engineering degree (1983).
- Entrance Scholarship to University of Ottawa (1984).
- Natural Science and Engineering Research Counsel (NSERC) scholarship towards graduate studies – Master of Applied Science in Engineering (1984 – 1985).
- Advantages of circulating fluidized bed combustion
- Circulating fluidized bed combustion technology
- Development of circulating fluidized bed boilers
- Components of CFB boilers: wind box and grid nozzle, bottom ash drain, HP blower, cyclone separator, evaporative or superheat wing walls, fuel feeding system, refractory, solid recycle system (loop seal), wall tubes, kick out, limestone and sand system
- Typical arrangements of CFB boilers
- Hydrodynamic in CFB boilers: particle classification, regimes of fluidization, fast fluidization, hydrodynamic regimes in a CFB boiler, Hydrodynamic structure of fast beds,
- Combustion in CFB boilers: coal properties for CFB boiler, stage of combustion, factors affecting combustion efficiency, combustion in CFB, biomass combustion
- Heat transfer in CFB boilers: gas to particle heat transfer, heat transfer in CFB boiler
- Design of CFB boilers: design and required data, combustion calculations, heat and mass balance, furnace design, cyclone separator
- CFB boiler operation: Requirements before starting, grid pressure drop test, cold start procedure, fill boiler procedure, start fan, boiler interlock, purge, start-up burner, drum and DA low level cut off, boiler warm-up, normal operation, normal shutdown, hot shutdown, hot restart,
- Malfunction and emergency: bed pressure, bed temperature, circulation, tube leak, drum level
- Maintenance of CFB boilers: Requirements before maintenance work, overview boiler maintenance, windbox inspection, furnace inspection, kick-out inspection, superheat (wingwalls), superheat (omega tube), roof inspection, inlet separator, steam drum, separator, outlet separator, screen tube, superheat tube, economizer inspection, air heater
- Basic boiler safety: warnings, general safety precaution, equipment entry, operating precautions
- CFB boiler control systems: Basic control, furnace control, main pressure control, main steam pressure control, drum level control, feed tank control, solid fuel control, HP blower control, primary air control, secondary air control, oxygen control, fuel oil control
- Boiler commissioning procedure
- Common problems and solutions of CFB boilers: wear problems in the boiler furnace, wastage in the boiler, thermally induced failures, anchor system induced failures, water wall tube failures (near lignite and subentry area), water wall tube failures at penthouse, main causes of tube failures, remedial actions, NMEJ failures, fitting of dust seal trap, clinker formation, remedial action taken, refractory damage, areas of major refractory damages, refractory damage in cyclones, APH tube chock-up, refractory failures at start-up burner and lignite entry area, chock-up in HP section
- Design of a CFB boiler
- Stoichiometric Calculations in a CFB boiler
- Heat and Mass Transfer in a CFB boiler
- Heat Balance
- Calcination loss
- Sulfation credit
- Unburnt carbon loss in ash
- Dry flue gas loss
- Moisture loss
- Division of solid stream (bed ash vs. fly ash)
- Control of particle size distribution in bed
- Furnace design
- Furnace cross section
- Width and depth ratio
- Furnace openings
- CFB boiler configuration
- CFB boiler without external heat exchanger
- CFB design with external fluid bed heat exchanger (FBHE)
- Design with internal fluid bed heat exchanger
- CFB design without cyclone
- Cooled cyclone versus hot cyclone
- Design of heating surfaces
- Disposition of heating surfaces
- Effect of fuel type
- Biomass fired CFB boiler
- Waste fired CFB boiler
- Heat absorption in external heat exchanger (EHE)
- Heat absorption in the furnace and back pass of the boiler
- Energy and mass balance around CFB loop
- Example of thermal design of a CFB boiler
- Design of CFB components
- Types of non-mechanical valves
- Principle of operation of non-mechanical valves
- L-valve, V-valve
- Loop seal (seal pot or J-valve)
- Design of L-valve
- Maximum solid flow rate through L-valve
- Practical consideration
- Design of loop seal
- Pressure balance
- Size of loop seal
- Design of loop seal
- Pressure balance
- Size of loop seal
- Intrex with J-valve
- Grate or fluidizing air distributor
- Types of distributors
- Design methods
- Fluidizing air distributor for CFB
- Nozzle plate design
- Practical considerations
- Plenum air loss
- Sealing distributor
- Attrition
- Back-flow of solids
- Material Selection for a Circulating fluidized bed boiler
- Pressure part materials in a CFB boiler
- Corrosion potential in a CFB boiler
- Erosion potential in a CFB boiler
- Selection of tube materials
- Commonly used materials in a CFB boiler
- Carbon and alloy steels
- Subcritical CFB boilers
- Supercritical CFB boiler
- Refractory and insulations
- Properties of refractory material
- Design considerations of refractory lining
- Anchors
- Areas of refractory use in a CFB boiler
- Refractory application
- Expansion joints in a CFB boiler
- Material-related problems in a CFB boiler
- Lower combustor
- Water-cooled cyclones
- Potential operating problems with CFB boilers: blockage of feed lines, loss in efficiency, material degradation, solid leakage, fouling, and agglomeration
- Major Operating Problems in CFB Boilers
- Failure of CFB Boiler Components
- Degradation of CFB Boiler Components
- Reduced Performance of the Whole CFB Boiler or Specific Components
- Design and Construction of the Boiler
- Options for Reduction in Erosion in CFB Boilers
- Corrosion Inside CFB Boilers
- Erosion-Corrosion
- Fouling and Deposit Formation Inside CFB Boiler
- Prevention of High Temperature Corrosion in CFB Boiler
- Use of Additives to Prevent High-Temperature Corrosion in CFB Boiler
- Reduction of Flue Gas Temperature at the Furnace Outlet
- Use of Corrosion Resisting Alloys
- Avoidance of Simultaneous Occurrence of High Gas Temperature and High Wall Temperature
- Avoidance of Contact of High Wall Temperature and Corrosion Agents
- Refractory Failure
- Thermally Induced Failures
- Anchor Failures
- Erosion Failures
- Maintenance Issues
- Design Audit
- Material Audit
- Preventive and Remedial Measures for Fireside Corrosion
- Preventive Maintenance for Refractory
- Operating Issues
- Safety Issues
- Wind-box Explosion
- Reduced Boiler Performance
- High Furnace Temperature
- Excess Emission of NOx and SO2
- Bed Agglomeration
- Fouling
- Loop-seal Problems
- Methods used to improve the heat rate of circulating fluidized bed boilers
- Supercritical Once-Through Internal Recirculation-Circulating Fluidized Bed Boilers (IR-CFB) Boilers for Power Generation
- Supercritical once-through circulating fluidized bed with in-bed heat exchanger (IBHX)
- Supercritical once-through circulating fluidized bed design study
- Ultra supercritical circulating fluidized bed boilers
TLNT reserves the right to cancel or change the date or location of its events. TLNT's responsibility will, under no circumstances, exceed the amount of the fee collected. TLNT is not responsible for the purchase of non-refundable travel arrangements or accommodations or the cancellation/change fees associated with cancelling them. Please call to confirm that the course is running before confirming travel arrangements and accommodations. Please click here for complete policies.
We could offer any of our courses at a location of your choice and customized contents according to your needs, please contact us at: [email protected] or click here to submit an online request.
Reviews
Interested in this course?
Click HereStart time: {{ sessionStartTimeWithZone(session) }}
{{ timeZoneCaptionFromSettings() }}
There are no future dates for this course
Jumpstart your training with the help of Talented Technology Training Canada (TTT-Canada) & the Canada Job Grant.
Seminars and Workshops offered within your organization anywhere in the world.
Get notified of our upcoming early bird discounts.
Submit this form for no-obligation course inquiries. One of our agents will contact you at the email or phone you enter below.